Total construction time is reported to have been 16 weeks. The domed roof comprises 316 precast concrete panels (most hexagonal) in 16 patterns, each weighing some 3200 lb (1,500 kg). The first pentagonal panel was placed on August 29, with the rest to be installed over 4 weeks.
the year 1963/64